Shop drawings are produced by contractors and suppliers under their contract with the owner. The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents. [1] The shop drawing normally shows more detail than the construction documents.
The dowels need to be smooth, round, epoxy and made of bond breaker coated steel conforming to requirements. The bond breaker is to be applied on all surfaces of the dowel bar. The expansion caps belong at each end of the dowel bar and the dowel bar support chairs are used to firmly hold the dowels centered in the slots during backfill operations.
A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built.Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Control joints must have adequate depth and not exceed maximum spacing for them to be effective. Typical specifications for a four-inch-thick slab are: [8] 25% depth of material; spacing at 24 × to 36 × of slab depth (some specification call for a maximum of 30 ×) special care for inside corners
Slab-on-grade or floating slab foundations are a structural engineering practice whereby the concrete slab that is to serve as the foundation for the structure is formed from a mold set into the ground. The concrete is then placed into the mold, leaving no space between the ground and the structure.
A dowel plate. The traditional tool for making dowels is a dowel plate, an iron (or better, hardened tool steel) plate with a hole having the size of the desired dowel.To make a dowel, a piece of wood is split or whittled to a size slightly bigger than desired and then driven through the hole in the dowel plate.
Engineering fits are generally used as part of geometric dimensioning and tolerancing when a part or assembly is designed. In engineering terms, the "fit" is the clearance between two mating parts, and the size of this clearance determines whether the parts can, at one end of the spectrum, move or rotate independently from each other or, at the other end, are temporarily or permanently joined.