Search results
Results from the WOW.Com Content Network
Excavators are heavy construction equipment primarily consisting of a boom, dipper (or stick), bucket, and cab on a rotating platform known as the "house" [1]. The modern excavator's house sits atop an undercarriage with tracks or wheels , being an evolution of the steam shovel (which itself evolved into the power shovel when steam was replaced ...
Excavation may be classified by type of material: [1]: 13.1 Topsoil excavation; Earth excavation; Rock excavation; Muck excavation – this usually contains excess water and unsuitable soil; Unclassified excavation – this is any combination of material types; Excavation may be classified by the purpose: [1]: 13.1, 13.2
An excavation lake (also a flooded gravel pit) is an artificial lake, which usually has its origins in the excavation of gravel or sand for construction materials or in some other kind of surface mining. In many cases, the excavation holes are landscaped according to the land restoration required by law.
Construction along Ontario Highway 401, widening the road from six to twelve travel lanes. A construction project is a complex net of construction contracts and other legal obligations, each of which all parties must carefully consider. A contract is the exchange of a set of obligations between two or more parties, and provides structures to ...
A crawler excavator, also known as a track-type excavator or tracked excavator, is a type of heavy construction equipment primarily used for excavation and earthmoving tasks. It is characterized by its tracked undercarriage, which provides superior mobility and traction compared to wheeled excavators, especially in soft, uneven, or unstable ...
In construction, trenches are dug for foundations of buildings, retaining walls and dams, and for cut-and-cover construction of tunnels. In archaeology, the "trench method" is used for searching and excavating ancient ruins or to dig into strata of sedimented material.
Excavation of Olive Mount cutting, Liverpool. Watercolour by T.T.Bury (1833) The cutting was 20 ft (6.1 m) wide and 70 ft (21.3 m) deep. Construction required the removal of 480,000 cubic yards (370,000 m 3) of sandstone. Olive Mount cutting, Liverpool, England; Talerddig cutting, Wales
The guide walls are constructed near the ground surface to outline the desired slurry trench, and to guide the excavation machinery. Excavation is done using a special clamshell-shaped digger or a hydromill trench cutter, suspended from a crane. The excavator digs down to design depth (or bedrock) for the first wall segment.