Search results
Results from the WOW.Com Content Network
1: Track gauge: 850 mm (2 ft 9 + 15 ... (14.8 ft/s) – funicular 1.6 m/s (5.2 ft/s) – lift: ... the intersection of the gondolas is at the base of the lift shaft ...
The concept of a shaft-driven lift-fan dates back to the mid-1950s. [9] The lift fan was demonstrated by the Allison Engine Company in 1995–97. [10] The U.S. Department of Defense (DOD) awarded General Electric and Rolls-Royce a $2.1 billion contract to jointly develop the F136 engine as an alternative to the F135.
A simple dumbwaiter is a movable frame in a shaft, dropped by a rope on a pulley, guided by rails; most dumbwaiters have a shaft, cart, and capacity smaller than those of passenger elevators, usually 45 to 450 kg (100 to 992 lbs.) [2] Before electric motors were added in the 1920s, dumbwaiters were controlled manually by ropes on pulleys. [1]
The lift height, the spacing between ledgers, is 2 m, although the base lift can be up to 2.7 m. The diagram above also shows a kicker lift, which is just 150 mm or so above the ground. Transom spacing is determined by the thickness of the boards supported, 38 mm boards require a transom spacing of no more than 1.2 m while a 50 mm board can ...
25 mm to 60 mm with 5 mm steps; 60 mm to 110 mm with 10 mm steps; 110 mm to 140 mm with 15 mm steps; 140 mm to 500 mm with 20 mm steps; The standard lengths of the shafts are 5 m, 6 m and 7 m. Usually 1m to 5m is used.
Johnson Lifts started out doing lift maintenance. [8] The company installed its first lift at the New Woodlands Hotel in Chennai in 1966. [1] It began manufacturing lifts in 1970. [8] Johnson Lifts started out with a small manufacturing unit at Vyasarpadi, before moving to a larger facility in Ambattur in 1988. [9] K.J. John died in 2002. [8]
Headframe of the #1 Shaft at Oyuu Tolgoi. A steel headframe is less expensive than a concrete headframe; the tallest steel headframe measures 87 m. [4] Steel headframes are more adaptable to modifications (making any construction errors easier to remedy), and are considerably lighter, requiring less substantial foundations.
Assuming 1.0 kN/m 2 is applied for oiled steel formwork; Suction force: S = A x 1.0 kN/m 2 = 18 x 1.0 = 18 kN; Applied loads at element lifting (sling angle and lateral tension) F = W x Ksl x Ks x 0.5 = 64.8 x 1.16 x 1.2 x 0.5 = 45.1 kN; Anchor capacity for initial lift F/n = 23 kN per anchor during initial lift (n = 2 lifting anchors)