Search results
Results from the WOW.Com Content Network
A single-phase, three-winding converter transformer. The converter transformers step up the voltage of the AC supply network. Using a star-to-delta or "wye-delta" connection of the transformer windings, the converter can operate with 12 pulses for each cycle in the AC supply, which eliminates numerous harmonic current components. The insulation ...
Electric power transmission through interconnectors using high-voltage direct-current (HVDC) involves usually two converter stations and a transmission line. Generally overhead lines are used, but an important class of HVDC projects use submarine power cables.
Another requirement is to provide low-voltage electricity to a device from mains electricity; this would be done by what is usually called a power supply.Most modern electronic devices require between 1.5 and 24 volts DC; lower-powered devices at these voltages can often work either from batteries or mains.
Located off the northwest coast of Portugal near Póvoa de Varzim, the farm had an installed capacity of 2.25 MW and was the world's first multiple machine wave power project. [6] The project was part funded by Portuguese utility Enersis, [7] at the time owned by Australian global investment company Babcock & Brown. [8]
The HVDC Cross-Channel (French: Interconnexion France Angleterre IFA 2000) is the 73-kilometre-long (45 mi) high-voltage direct current (HVDC) interconnector that has operated since 1986 under the English Channel between the continental European grid at Bonningues-lès-Calais and the British electricity grid at Sellindge.
By using the converter to control the rotor currents, it is possible to adjust the active and reactive power fed to the grid from the stator independently of the generator's turning speed. The control principle used is either the two-axis current vector control or direct torque control (DTC). [ 13 ]
Underground cables take up no right-of-way, have lower visibility, and are less affected by weather. However, cables must be insulated. Cable and excavation costs are much higher than overhead construction. Faults in buried transmission lines take longer to locate and repair.
Adelanto Converter Station in Adelanto, California, is the southern terminus of the 2,400 MW Path 27 Utah–California high voltage DC power (HVDC) transmission line. The station contains redundant thyristor -based HVDC converters rated for 1,200 MW continuous or 1,600 MW short term overload. [ 1 ]