Search results
Results from the WOW.Com Content Network
They are based on "steady-state (equilibrium) ampacity" calculations. Emergency ratings are based on transient equations and models: they provide permissible overload ratings for a short and adjustable time (typically 5 to 30 minutes). Forecasting methods have been developed to determine intraday and day-ahead ampacity forecasts.
Distribution transformers typically have ratings less than 200 kVA, [3] although some national standards allow units up to 5000 kVA to be described as distribution transformers. Since distribution transformers are energized 24 hours a day (even when they don't carry any load), reducing iron losses is vital in their design.
IEC 60852 Outline dimensions of transformers and inductors for use in telecommunication and electronic equipment; IEC 60853 Calculation of the cyclic and emergency current rating of cables; IEC TR 60854 Methods of measuring the performance of ultrasonic pulse-echo diagnostic equipment
The ratio of the voltage bases on either side of a transformer is selected to be the same as the ratio of the transformer voltage ratings. With these two rules, a per-unit impedance remains unchanged when referred from one side of a transformer to the other. This allows the ideal transformer to be eliminated from a transformer model.
The burden (load) impedance should not exceed the specified maximum value to avoid the secondary voltage exceeding the limits for the current transformer. The primary current rating of a current transformer should not be exceeded, or the core may enter its non-linear region and ultimately saturate. This would occur near the end of the first ...
The oil is cooled by the outside of the tank in small ratings, and by an air-cooled radiator in larger ratings. Where a higher rating is required, or where the transformer is in a building or underground, oil pumps circulate the oil, fans may force air over the radiators, or an oil-to-water heat exchanger may also be used. [9]
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
A capacitor voltage transformer (CVT), is a transformer used in power systems to step down extra high voltage signals and provide a low voltage signal to the actual VT (voltage transformer) used for operating metering/protective relays due to a lower cost than an electromagnetic PT. The circuit diagram for a simple capacitor voltage transformer