enow.com Web Search

  1. Ads

    related to: carrier 7.5 ton condensing units heating and cooling installation near me

Search results

  1. Results from the WOW.Com Content Network
  2. Fan coil unit - Wikipedia

    en.wikipedia.org/wiki/Fan_coil_unit

    Refrigerant based Fan-Coil Unit. Other variants utilize a chilled, or heated water loop for space cooling, or heating, respectively. A fan coil unit (FCU), also known as a Vertical Fan Coil Unit (VFCU), is a device consisting of a heat exchanger (coil) and a fan. FCUs are commonly used in HVAC systems of residential, commercial, and industrial ...

  3. Liebert Corporation - Wikipedia

    en.wikipedia.org/wiki/Liebert_Corporation

    In 1965, Liebert founded Liebert Corporation as the first manufacturer air conditioning units with temperature and humidity controls specific for computer room applications. [3] In 1977, Liebert launched Conditioned Power Corporation to design and manufacture power distribution, conditioning and monitoring systems for the data processing industry.

  4. Ventilation (architecture) - Wikipedia

    en.wikipedia.org/wiki/Ventilation_(architecture)

    Standards dealing with the design and operation of ventilation systems to achieve acceptable indoor air quality include the American Society of Heating, Refrigerating and Air-Conditioning Engineers Standards 62.1 and 62.2, the International Residential Code, the International Mechanical Code, and the United Kingdom Building Regulations Part F.

  5. Air conditioning - Wikipedia

    en.wikipedia.org/wiki/Air_conditioning

    [2] [3] Air conditioning is a member of a family of systems and techniques that provide heating, ventilation, and air conditioning (HVAC). [4] Heat pumps are similar in many ways to air conditioners, but use a reversing valve to allow them both to heat and to cool an enclosed space.

  6. LeVeque Tower - Wikipedia

    en.wikipedia.org/wiki/LeVeque_Tower

    The building's frame would consist of 10,000 tonnes (9,800 long tons; 11,000 short tons) of steel, and would be wired with 100 miles (160 km) of electrical wire, 137,000 feet (42,000 m) of heating pipe for thousands of radiators, 67 electrical motors, 14,000 electrical outlets, and 1,756 windows. Construction of the building took 19 months.

  7. Cleveland Convention Center - Wikipedia

    en.wikipedia.org/wiki/Cleveland_Convention_Center

    The plans called for 18 to 24 months of work [163] [169] on waterproofing the pool; repairing mall sidewalks; repairing and upgrading the air conditioning, electrical, and ventilation systems; replacing the heating system; adding moveable partitions to the Great Hall; replacing the doors on the loading dock; and renovating the reception pavilion.

  1. Ads

    related to: carrier 7.5 ton condensing units heating and cooling installation near me