A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
The construction costs given in the table are strongly related to the oxidation state of these compounds. That is: highest construction costs are for highly reduced compounds like lipids and lignin, lowest for highly oxidized organic compounds such as organic acids, and for the minerals. This is the basis for short-cut methods that estimate ...
A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. A cost ...
A building estimator or cost estimator is an individual that quantifies the materials, labor, and equipment needed to complete a construction project. Building cost estimating can concern diverse forms of construction from residential properties to hi-rise and civil works. Both estimators and quantity surveyors must have a background education ...
Construction costs (biology), a concept in biology relating to the amount of glucose required to construct a unit of plant biomass. Topics referred to by the same term This disambiguation page lists articles associated with the title Construction costs .
Cost engineering is "the engineering practice devoted to the management of project cost, involving such activities as estimating, cost control, cost forecasting, investment appraisal and risk analysis". [1] "Cost Engineers budget, plan and monitor investment projects. They seek the optimum balance between cost, quality and time requirements." [2]
To prepare the bid, first a cost estimate is prepared to determine the costs and then establish the price(s). This involves reviewing the project's plans and specifications to produce a take-off or quantity survey, which is a listing of all the materials and items of work required for a construction project by the construction documents ...
The most basic element of a cost estimate and therefore the cost database is the estimate line item or work item. [3] An example is "Concrete, 4000 psi (30 MPa)," which is the description of the item. In the cost database, an item is a row or record in a table (of items) and the description is a column or field for that record.