For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
In-situ evaluation of silane treated concrete cast using Zemdrain formwork liner at Dock street bridge, Belfast. Internal report to Du pont De Nemours, Luxembourg, Report No - TAS 139, June, 1992, p. 8, (Unpublished). Reddi, S.A. Permeable formwork for impermeable concrete. Indian Concrete Journal, January, 1992, pp. 31–35.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
Like other concrete formwork, the forms are filled with concrete in 1-foot to 4-foot high "lifts" to manage the concrete pressure and reduce the risk of blowouts. After the concrete has cured, the forms are left in place permanently to provide a variety of benefits, depending on materials used: Thermal insulation; Soundproofing
When selecting an anchor, consider the element formwork and the ease of placement and securing of the anchor prior and during the pouring of the concrete. For example, some of the anchors shown in figures 4-6, can be placed into thin wall elements as the anchor chair maintains the position relative to the element thickness .
Concrete has a very low coefficient of thermal expansion, and as it matures concrete shrinks. All concrete structures will crack to some extent, due to shrinkage and tension. Concrete which is subjected to long-duration forces is prone to creep. The density of concrete varies, but is around 2,400 kilograms per cubic metre (150 lb/cu ft). [1]
First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.