An embankment is a raised wall, bank or mound made of earth or stones, that are used to hold back water or carry a roadway. A road , railway line , or canal is normally raised onto an embankment made of compacted soil (typically clay or rock-based) to avoid a change in level required by the terrain , the alternatives being either to have an ...
Embankment dams come in two types: the earth-filled dam (also called an earthen dam or terrain dam) made of compacted earth, and the rock-filled dam. A cross-section of an embankment dam shows a shape like a bank, or hill. Most have a central section or core composed of an impermeable material to stop water from seeping through the dam.
A flood embankment is traditionally an earth wall used to shore up flood waters. Most flood embankments are between 1 metre and 3 metres high. A 5-metre-high (16 ft) flood embankment is rare.
This process is repeated with successive layers of panels, earth and reinforcements. The panels are thus tied into the earth embankment to make a stable structure with balanced stresses. [82] Although construction using the basic principles of MSE has a long history, MSE was developed in its current form in the 1960s.
Heavy construction equipment is usually used due to the amounts of material to be moved — up to millions of cubic metres. Earthwork construction was revolutionized by the development of the scraper and other earth-moving machines such as the loader, the dump truck, the grader, the bulldozer, the backhoe, and the dragline excavator.
A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...
For dam construction, two cofferdams are usually built, one upstream and one downstream of the proposed dam, after an alternative diversion tunnel or channel has been provided for the river flow to bypass the foundation area of the dam. These cofferdams are typically a conventional embankment dam of both earth- and rock-fill, but concrete or ...
Embankment construction began in late July. The upper portion of the upstream slope of the dam was covered with a layer of riprap, and the lower section was protected by a layer of gravel. By the end of 1952, the construction work was approximately 67% complete. [1] Construction continued at a rapid pace after the beginning of the 1953 season.