Search results
Results from the WOW.Com Content Network
For roads without curbs, the clearance for that is 1.5 metres (4 ft 11 in) given that the minimum clearance from the center line of the roads is 5 metres (16 ft 5 in). [ 21 ] For roadways that require passing under some structures such as tunnels, there are standards on the entire width of the roads known as horizontal curb-to-curb and wall-to ...
External access point for fire sprinkler and dry standpipe at a building in San Francisco, US Antique wet standpipe preserved at Edison and Ford Winter Estates. A standpipe or riser is a type of rigid water piping which is built into multi-story buildings in a vertical position, or into bridges in a horizontal position, to which fire hoses can be connected, allowing manual application of water ...
Fire barriers are continuous through concealed spaces (e.g., above a ceiling) to the floor deck or roof deck above the barrier. Fire partitions are not required to extend through concealed spaces if the construction assembly forming the bottom of the concealed space, such as the ceiling, has a fire resistance rating at least equal to or greater ...
Comparison of a ha-ha (top) and a regular wall (bottom). Both walls prevent access, but one does not block the view looking outward. A ha-ha (French: hâ-hâ [a a] ⓘ or saut de loup [so dÉ™ lu] ⓘ), also known as a sunk fence, blind fence, ditch and fence, deer wall, or foss, is a recessed landscape design element that creates a vertical barrier (particularly on one side) while preserving ...
In the U.S., every plumbing fixture must also be coupled to the system's vent piping. [1] Without a vent, negative pressure can slow the flow of water leaving the system, resulting in clogs, or cause siphonage to empty a trap. The high point of the vent system (the top of its "soil stack") must be open to the exterior at atmospheric pressure.
Take-offs may be fitted into round or rectangular openings cut into the wall of the main duct. The take-off commonly has many small metal tabs that are then bent to attach the take-off to the main duct. Round versions are called spin-in fittings. Other take-off designs use a snap-in attachment method, sometimes coupled with an adhesive foam ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Vertical clearance: The minimum vertical clearance under overhead structures, such as bridges, is 16 feet (4.9 m), including both paved shoulders and an allowance for extra layers of pavement. Through urban areas, at least one routing is to have 16-foot (4.9 m) clearances, but others may have a lesser clearance of 14 feet (4.3 m).