Search results
Results from the WOW.Com Content Network
The first German jet engines built during the Second World War used a mechanical APU starting system designed by the German engineer Norbert Riedel.It consisted of a 10 horsepower (7.5 kW) two-stroke flat engine, which for the Junkers Jumo 004 design was hidden in the engine nose cone, essentially functioning as a pioneering example of an auxiliary power unit for starting a jet engine.
The M548 is a tracked cargo carrier. It is based on the M113 armored personnel carrier, ... Modifications included installation of 60W, 400hz power system and ground ...
The M577 command post carrier, also known as the M577 command post vehicle or armored command post vehicle, is a variant of the M113 armored personnel carrier that was developed and produced by the FMC Corporation to function on the battlefield as a mobile command post i.e. a tactical operations centre, usually at the battalion level.
A single C-2 (2797) was equipped with an air-to-air refueling probe, but this was not installed in other aircraft. [4] [5] In 1984, the Navy ordered 39 new C-2A aircraft to replace older airframes. Dubbed the Reprocured C-2A or C-2A(R) due to the similarity to the original, the new aircraft has airframe improvements and better avionics.
EGTS is an electric taxiing system enabling an aircraft to taxi independently of its main engines or tug. [2]Each of the two main landing gear inboard wheels is driven by an electric motor powered by the auxiliary power unit (APU) generator, allowing the aircraft to push back from the gate without an airport tug and to taxi without the use of the main engines.
Small quantity, use unknown but thought to be system carrier application, and possibly radar. [43] Turkey Supplied via Aselsan; small quantity, use unknown but thought to be system carrier application. [43] Ukraine Ukraine has received a selection of HX trucks, the total number of which is thought to be around 350.
President Joe Biden signed an executive order on Tuesday to provide federal support to address massive energy needs for fast-growing advanced artificial intelligence data centers, the White House ...
If she was fitted with geared turbines and new boilers for 60,000 metric horsepower (44,000 kW), the designers estimated that the carrier would have a speed of 23.4 knots (43.3 km/h; 26.9 mph), although installation of bulges would cost over a knot (22.3 knots (41.3 km/h; 25.7 mph)) and increase displacement by about 500 t (492 long tons).