In the Eurocode series of European standards (EN) related to construction, Eurocode 7: Geotechnical design (abbreviated EN 1997 or, informally, EC 7) describes how to design geotechnical structures, using the limit state design philosophy. It is published in two parts; "General rules" and "Ground investigation and testing".
Directional boring machine. Directional boring, also referred to as horizontal directional drilling (HDD), is a minimal impact trenchless method of installing underground utilities such as pipe, conduit, or cables in a relatively shallow arc or radius along a prescribed underground path using a surface-launched drilling rig.
The process is slow and demanding, requiring teamwork and coordination. To prevent the walls from collapsing and to ensure water quality, the borehole is lined with materials like bricks, stones, or concrete rings. This reinforcement maintains the integrity of the borehole's structure and helps to prevent contamination.
All of the EN Eurocodes relating to materials have a Part 1-1 which covers the design of buildings and other civil engineering structures and a Part 1-2 for fire design. The codes for concrete, steel, composite steel and concrete, and timber structures and earthquake resistance have a Part 2 covering design of bridges.
Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...
Rock quality designation (RQD) has several definitions. The most widely used definition was developed in 1964 by D. U. Deere. It is the borehole core recovery percentage incorporating only pieces of solid core that are longer than 100 mm in length measured along the centerline of the core.
The purpose of the drill is to create a tunnel under surface obstructions. First, the operator surveys the area and the obstacle (road, sidewalk, driveway). Utility locators must supervise any underground work, and the path most clear of utilities is chosen to send the tool through. The first hole is dug on one side of the obstacle.
Due to this design features, a certain amount of the cutting forces during the process is transferred via the guide pads to the bore hole wall. These force components at the tool head are supported at the produced borehole wall and thus guide the tool in the bore hole itself.