The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Short forms, up to 60 cm high, are placed on both sides of the wall to serve as a guide for the stone work. The stones are placed inside the forms with the good faces against the form work. Concrete is poured in behind the rocks. Rebar is added for strength, to make a wall that is approximately half reinforced concrete and half stonework. The ...
Slip forming, a widely used technique today for building vertical concrete cores for high-rise buildings, was developed in the early 20th century for building silos and grain elevators. The concept was pioneered by James MacDonald, of MacDonald Engineering Chicago, and published by Milko S. Ketchum in an illustrated book: The Design of Walls ...
Slip forming is method of concrete placement whereby a moving form is used to create a continuous wall extrusion. This method is very efficient for well-suited structures, such as flanged and core wall systems. A very accurate wall thickness can be achieved but the surface is rough because of the abrasion of the form on the walls.
This technique is typically used to form complicated shapes like figurative ceramics that would be difficult to be reproduced by hand or other forming techniques. [1] The technique involves a clay body slip, usually prepared in a blunger, being poured into plaster moulds and allowed to form a layer, the cast, on the internal walls of the mould.
Formwork for beams takes the form of a box that is supported and propped in the correct position and level. The removal time for the formwork will vary with air temperature, humidity and consequent curing rate. Typical striking times are as follows (using air temperature of 7-16 °C): Form work. Beam sides: 9–12 hours. Beam soffits: 8–14 days.
Prestressing is a technique of introducing stresses into a structural member during fabrication and/or construction to improve its strength and performance. This technique is often employed in concrete beams, columns, spandrels, single and double tees, wall panels, segmental bridge units, bulb-tee girders, I-beam girders, and others.
Slip decoration is an ancient technique in Chinese pottery also, used to cover whole vessels over 4,000 years ago. [11] Principal techniques include slip-painting, where the slip is treated like paint and used to create a design with brushes or other implements, and slip-trailing, where the slip, usually rather thick, is dripped onto the body.