Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...
Crosshole sonic logging (CSL) is a method to determine the structural integrity of drilled shafts and other concrete piles. The CSL method is considered to be more accurate than sonic echo testing in the determination of structural soundness of concrete within the drilled shaft inside of the rebar cage. This method provides little indication of ...
H-beam sections (typical column sections, due to resistance to bending in all axis) may be driven at angles "raked" to rock or other firmer soils; the H-beams are left extended above the base. A reinforced concrete plug may be placed under the water, a process known as tremie concrete placement. When the caisson is dewatered, this plug acts as ...
For premium support please call: 800-290-4726 more ways to reach us
Pile integrity testing using low-strain tests such as the TDR (Transient Dynamic Response) method, is a rapid way of assessing the continuity and integrity of concrete piled foundations. The test measures: pile length, or depth to anomalies; pile head stiffness; pile shaft mobility, which is dependent on pile section and concrete properties
Once initial piles are set with concrete, other shafts are augured between them, slicing into the original piles, with the new ones receiving rebar. The finished result is a continuous wall of reinforced concrete that aids and protects workers during excavation. [citation needed]
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
Screw foundations first appeared in the 1800s as pile foundations for lighthouses, [4] and were extensively used for piers in harbours. Between the 1850s through 1890s, more than 100 screw-pile lighthouses were erected on the east coast of the United States using screw piles. Made originally from cast or wrought iron, they had limited bearing ...