enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Distribution transformer - Wikipedia

    en.wikipedia.org/wiki/Distribution_transformer

    Phase-to-phase transformer in Britain Primary line on the right toward the front and secondary lines in the back of this single-phase transformer. Both pole-mounted and pad-mounted transformers convert the overhead or underground distribution lines' high 'primary' voltage to the lower 'secondary' or 'utilization' voltage inside the building.

  3. Knob-and-tube wiring - Wikipedia

    en.wikipedia.org/wiki/Knob-and-tube_wiring

    The conduit methods were known to be of better quality, but cost significantly more than K&T. [2] In 1909, flexible armored cable cost about twice as much as K&T, and conduit cost about three times the price of K&T. [6] Knob and tube wiring persisted since it allowed owners to wire a building for electricity at lower cost.

  4. Single-line diagram - Wikipedia

    en.wikipedia.org/wiki/Single-line_diagram

    A typical one-line diagram with annotated power flows. Red boxes represent circuit breakers, grey lines represent three-phase bus and interconnecting conductors, the orange circle represents an electric generator, the green spiral is an inductor, and the three overlapping blue circles represent a double-wound transformer with a tertiary winding.

  5. Electric power distribution - Wikipedia

    en.wikipedia.org/wiki/Electric_power_distribution

    Rural services normally try to minimize the number of poles and wires. It uses higher voltages (than urban distribution), which in turn permits use of galvanized steel wire. The strong steel wire allows for less expensive wide pole spacing. In rural areas a pole-mount transformer may serve only one customer.

  6. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    flag note, flagnote: A note that is called out in specific spots in the field of the drawing. It is numbered with a stylized flag symbol surrounding the number. A general note applies generally and is not called out with flags. FL Floor Level Floor Level of an existing or proposed building or concrete pad FN or F/N: flag note, flagnote; find ...

  7. Aluminum building wiring - Wikipedia

    en.wikipedia.org/wiki/Aluminum_building_wiring

    The use of larger gauge stranded aluminum wire (larger than #8 AWG) is fairly common in much of North America for modern residential construction. Aluminum wire is used in residential applications for lower voltage service feeders from the utility to the building. This is installed with materials and methods as specified by the local electrical ...

  8. Three-phase electric power - Wikipedia

    en.wikipedia.org/wiki/Three-phase_electric_power

    The conductors between a voltage source and a load are called lines, and the voltage between any two lines is called line voltage. The voltage measured between any line and neutral is called phase voltage. [4] For example, in countries with nominal 230 V power, the line voltage is 400 V and the phase voltage is 230 V.

  9. Electrical wiring in North America - Wikipedia

    en.wikipedia.org/wiki/Electrical_wiring_in_North...

    The most common residential and small commercial service in Canada and the U.S., single split-phase, 240 V, features a neutral and two hot legs, 240 V to each other, and 120 V each to the neutral. The most common three-phase system will have three hot legs, 208 V to each other and 120 V each to the neutral.