Search results
Results from the WOW.Com Content Network
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
He formed his own company in 1901 and received a patent in 1908 for an innovative flat-slab support system, known as the Turner System or the Spiral Mushroom System, using reinforced concrete, although this patent was invalidated in 1915 and 1916 in favor of similar patents filed by American engineer O.W. Norcross.
A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built. Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings. The structural drawings are primarily concerned with the ...
Floor Level of an existing or proposed building or concrete pad FN or F/N: flag note, flagnote; find number: 1. Flagnote: A flagnote is a note that is called out in specific spots in the field of the drawing. It is numbered with a stylized flag symbol surrounding the number (or sometimes a delta symbol). A general note applies generally and is ...
Beam and block is a construction method to support flooring, especially for ground floors as well as multi story buildings. [1] It is made of cast concrete, one piece of which is a prestressed concrete beam, which can be an inverted T-shaped beam, or lintel, the other piece being a simple rectangular block. [1]
The assembly drawing gives the drawing numbers of the subsequent detailed components, quantities required, construction materials and possibly 3D images that can be used to locate individual items. Although mostly consisting of pictographic representations, abbreviations and symbols are used for brevity and additional textual explanations may ...
Suspended slab under construction, with the formwork still in place Suspended slab formwork and rebar in place, ready for concrete pour. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most ...
Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete. Though it is a cost-effective technique with a shorter completion time, [ 1 ] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.