This is a list of operational hydroelectric power stations in Canada with a current nameplate capacity of at least 100 MW. The Sir Adam Beck I Hydroelectric Generating Station in Ontario was the first hydroelectric power station in Canada to have a capacity of at least 100 MW upon completion in 1922. Since then numerous other hydroelectric ...
This list includes stations owned and operated by Independent Power Producers as well as by private utilities such as Nelson Hydro and FortisBC. In some cases, such as Lois Lake and Powell Lake, the electricity generated may be used solely for private industry, even if it is grid-connected.
BC Hydro also operates thermal power plants. The Burrard Thermal Generating Station contributes 7.5% and the remaining 14.5% of the electricity requirement was supplied by purchases and other transactions. [10] BC Hydro's last dam was completed in 1984, since then run-of-the-river projects with private partners have been built. Power production ...
Hinds Lake, Hinds Lake Hydroelectric Generating Station; Grand Lake, Deer Lake generating station; Paradise River Dam, Paradise River Hydroelectric Generating Station (the largest concrete arch dam in Eastern North America) Grand Falls Dam, Exploits River generating station; Bishops Falls Dam, Bishops Falls generating station
The following page lists all pumped-storage hydroelectric power stations that are larger than 1,000 MW in installed generating capacity, which are currently operational or under construction. Those power stations that are smaller than 1,000 MW , and those that are decommissioned or only at a planning/proposal stage may be found in regional ...
Sir Adam Beck Generating Station I, Sir Adam Beck Generating Station II and the Sir Adam Beck Pump Generating Station are all owned by Ontario Power Generation. Following the development of several smaller generating stations around Niagara Falls in the late 19th and early 20th centuries, the Province of Ontario authorized the construction of ...
When BC Hydro buys power from independent power producers they set a price as low as $76.20 per megawatt hour for intermittent power from wind farms, and as high as $133.80 for firm hydro power. The average price paid, as of 2010, was $100 per megawatt hour. [60] Site C is expected to cost $83 per megawatt hour for firm hydro power. [61]
The James Bay Project is Quebec's largest generation complex, with an installed capacity of 16,527 megawatt of power, approximately 40% of the province's peak load. Hydro-Québec , the government-owned public utility is the main power generator in the province with 59 hydroelectric facilities located across the province, for a total installed ...