Search results
Results from the WOW.Com Content Network
Route 81 (Naga–Uling Road) in Naga, Cebu: Route 8 (Cebu North Road) in Danao, Cebu: under construction North Luzon East Expressway: 92.1 57.2 E5 (NLEX Segment 8.2) in Quezon City: CLLEX in Cabanatuan, Nueva Ecija: under construction South Luzon Expressway Toll Roads 4 and 5 [2] 484 300 E2 (SLEX Toll Road 3) in Calamba, Laguna
The first expressways in the Philippines are the North Luzon Expressway (NLEX) and the South Luzon Expressway (SLEX), both of which were built in the late 1960s. [9] The first elevated toll road in the Philippines is the Skyway, with its construction consisting of numerous sections
The CAVITEX C-5 Link, signed as E2 of the Philippine expressway network, is a 7.708-kilometer (4.790 mi) controlled-access toll expressway in Metro Manila connecting the Manila–Cavite Expressway (CAVITEX) to the Circumferential Road 5 (C-5) in Taguig.
Pages in category "Toll roads in the Philippines" The following 22 pages are in this category, out of 22 total. ... South Luzon Expressway; Southern Tagalog Arterial ...
The Toll Regulatory Board is a Philippine government agency that regulates all toll roads in the Philippines. The TRB was created by virtue of Presidential Decree (“P.D.”) No. 1112 or the Toll Operation Decree.
The Tarlac–Pangasinan–La Union Expressway (TPLEX), signed as E1 of the Philippine expressway network and R-8 of the Metro Manila arterial road network, is a controlled-access toll expressway that connects the Central Luzon region with the Ilocos Region.
The toll system of Subic–Clark–Tarlac Expressway is a closed road system that uses cards with magnetic strips, and from March 2016, electronic toll collection, using the Easytrip system by its concessionaire, Manila North Tollways Corporation (now NLEX Corporation), is introduced, eventually integrating the toll system of the expressway ...
The South Luzon Expressway Toll Road 4, also referred to as Toll Road 4 (TR4), is a 66.74-kilometer (41.47 mi) [38] extension of South Luzon Expressway from Calamba (near its boundary with Santo Tomas, Batangas) to Lucena. Construction is divided into five segments, with one additional extension to Mayao in Lucena on the revised project outline.