Search results
Results from the WOW.Com Content Network
The Wood–Armer method is a structural analysis method based on finite element analysis used to design the reinforcement for concrete slabs. [1] This method provides simple equations to design a concrete slab based on the output from a finite element analysis software.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The derivation of the maximum arching moment of resistance of laterally restrained concrete bridge deck slabs utilised Rankin's [21] idealised elastic-plastic stress-strain criterion for concrete, valid for concrete cylinder strengths up to at least 70N/mm 2, which he had derived on the basis of Hognestad, Hanson and McHenry's [23] ultimate ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
Slabs are one of the greatest consumers of concrete in many buildings, [14] so reducing the slab mass can make a relatively large difference to the environmental impact of a building's construction. Biaxial slabs may be marginally cheaper than solid slabs, partly due to the lower mass.
In roadway applications it is usually a poured reinforced concrete slab, but can also be a steel grid or wood plank. The deck includes any road lanes, medians, sidewalks, parapets or railings, and miscellaneous items like drainage and lighting. The supporting structure consists of the steel or concrete system supporting the deck. This includes ...
A w/c ratio higher than 0.60 is not acceptable as fresh concrete becomes "soup" [2] and leads to a higher porosity and to very poor quality hardened concrete as publicly stated by Prof. Gustave Magnel (1889-1955, Ghent University, Belgium) during an official address to American building contractors at the occasion of one of his visits in the ...