Search results
Results from the WOW.Com Content Network
In battery-powered equipment, a battery eliminator circuit (BEC) is an electronic voltage regulator used to power a subsystem at a different voltage without the need for a supplemental battery. BECs are commonly used in radio-controlled models , which need separate voltages to power the motor and the RC equipment.
1A7GT/DK32 – Pentagrid converter, re-engineered version of types 1A6 and 1D7-G, designed for use in portable AC/DC/Dry-cell battery radios introduced in 1938. Has 1.4 V/50 mA filament. 1B7-GT – Re-engineered version of types 1C6 and 1C7-G, designed for use in dry-cell battery radios with shortwave bands. Has 1.4 V/100 mA filament
The e5 featured a 65Ah lithium iron phosphate battery (LiFePO 4), capable of delivering an all-electric range of 220 km (137 mi), and a top speed of 150 km/h (93 mph). [3] [4] Retail sales began in China in September 2015. [5] 1,426 units were delivered in the Chinese market in 2015, [6] and 15,639 in 2016.
The Galaxy E5 is offered with a single-motor, front-wheel drive setup, paired with Geely's self-developed lithium iron phosphate (LFP) battery called the Aegis Short Blade. [12] It is rated at 160 kW (215 hp; 218 PS), with a claimed top speed of 175 km/h (109 mph) and 0–100 km/h (0–62 mph) acceleration time of 6.9 seconds.
The E5-00 has a smaller battery (1200 mAh) than both the E63 and the E72 (1500 mAh) but has the talk-time of 8 hours and stand by time over 10 days. It also features a GPS, both integrated and assisted, and runs Nokia Maps 3.0 and Ovi maps. Nokia E5 supports Mail for Exchange and IBM Lotus Notes Traveler for corporate emails. E5 supports HD ...
A battery electric version with a power output of 150 kW (204 PS; 201 hp) and a 61 kWh battery was introduced at the Auto Shanghai in April 2023. Named the Chery Omoda E5 or Omoda E5 or Omoda C5 EV depending on the market, [26] [27] the variant adopts a different front end styling along with other design changes. It also lacks any Chery logo ...
The heavy metals were seen in soils within two miles of a lithium battery storage site, which burned earlier this month. Vistra Energy's Moss Landing Power Plant was located in the unincorporated ...
The e5 Tanker claims to be the first fully electric oil tanker, powered by a 3.5 MWh battery which is projected to "run non-stop for 10 hours on a half-capacity battery". [12] The ship will include a high level of automation [13] and will be charged using wind and solar energy to further reduce emissions that would be incurred in charging the ...