Search results
Results from the WOW.Com Content Network
Secondary oil well control is done after the Primary oil well control has failed to prevent formation fluids from entering the wellbore. This process uses "blow out preventer", a BOP, to prevent the escape of wellbore fluids from the well. As the rams and choke of the BOP remain closed, a pressure built up test is carried out and a kill mud ...
The oil and gas industry uses wireline logging to obtain a continuous record of a formation's rock properties. Wireline logging can be defined as being "The acquisition and analysis of geophysical data performed as a function of well bore depth, together with the provision of related services."
Well control is the technique used in oil and gas operations such as drilling, well workover and well completion for maintaining the hydrostatic pressure and formation pressure to prevent the influx of formation fluids into the wellbore.
English: CYCLIC STEAM STIMULATION ("Huff-and-Puff') (A well-stimulation method) This method is sometimes applied to heavy-oil reservoirs to boost recovery during the primary production phase. During this time it assists natural reservoir energy by thinning the oil so it will more easily move through the formation to the injection/production wells.
A drill stem test (DST) is a procedure for isolating and testing the pressure, permeability and productive capacity of a geological formation during the drilling of a well. The test is an important measurement of pressure behaviour at the drill stem and is a valuable way of obtaining information on the formation fluid and establishing whether a ...
In this well, the outside casing of the 'B' annulus is 13 + 3 ⁄ 8 in (340 mm) N80 grade with a weight of 68 lb⋅ft (92 N⋅m) −1. The burst pressure of this casing is 5020 psi. 1.2 sg brine produces a pressure gradient of 0.52 psi.ft −1 (see Well kill for the mathematical basics of hydrostatic heads). Therefore, the column of brine ...
Well engineering consists of engineering facilitating the design and construction of a well. It is based on pore pressure , kick tolerance, casing functions, casing design and cementing. It is sometimes related to drilling and petroleum engineering .
Regularly, for example once a month per well, the flow from one and only one selected well is led into the test separator for determining well flow rate for the selected well. [3] The separator divides the flow from the well into the streams of individual products which typically are oil, gas and water, but may include natural-gas condensate ...