enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Drainage gradient - Wikipedia

    en.wikipedia.org/wiki/Drainage_gradient

    Drainage gradient (DG) is a term in road design, defined as the combined slope due to road surface cross slope (CS) and longitudinal slope (hilliness). Although the term may not be used, the concept is also used in roof design and landscape architecture. If the drainage gradient is too low, rain and melt water drainage will be insufficient.

  3. Stream gradient - Wikipedia

    en.wikipedia.org/wiki/Stream_gradient

    Stream gradient (or stream slope) is the grade (or slope) of a stream. It is measured by the ratio of drop in elevation and horizontal distance. [ 1 ] It is a dimensionless quantity , usually expressed in units of meters per kilometer (m/km) or feet per mile (ft/mi); it may also be expressed in percent (%).

  4. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  5. Cross slope - Wikipedia

    en.wikipedia.org/wiki/Cross_slope

    Cross slope, cross fall or camber is a geometric feature of pavement surfaces: the transverse slope with respect to the horizon. It is a very important safety factor. Cross slope is provided to provide a drainage gradient so that water will run off the surface to a drainage system such as a street gutter or ditch.

  6. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    Slope may still be expressed when the horizontal run is not known: the rise can be divided by the hypotenuse (the slope length). This is not the usual way to specify slope; this nonstandard expression follows the sine function rather than the tangent function, so it calls a 45 degree slope a 71 percent grade instead of a 100 percent. But in ...

  7. Reduced level - Wikipedia

    en.wikipedia.org/wiki/Reduced_level

    For drainage of water under gravity a suitable slope is required. Thus, roads are built in the fashion that their RL's on sides are comparatively smaller than the RL at the mid-span of the road. This ensures proper drainage of water from roads. For construction of buildings, roads, and dams, a horizontal levelled surface is required. So, at ...

  8. Hazen–Williams equation - Wikipedia

    en.wikipedia.org/wiki/Hazen–Williams_equation

    The equation for head loss in pipes, also referred to as slope, S, expressed in "feet per foot of length" vs. in 'psi per foot of length' as described above, with the inside pipe diameter, d, being entered in feet vs. inches, and the flow rate, Q, being entered in cubic feet per second, cfs, vs. gallons per minute, gpm, appears very similar.

  9. Watershed delineation - Wikipedia

    en.wikipedia.org/wiki/Watershed_delineation

    Watershed delineation is the process of identifying the boundary of a watershed, also referred to as a catchment, drainage basin, or river basin.It is an important step in many areas of environmental science, engineering, and management, for example to study flooding, aquatic habitat, or water pollution.