Search results
Results from the WOW.Com Content Network
In the power systems analysis field of electrical engineering, a per-unit system is the expression of system quantities as fractions of a defined base unit quantity. . Calculations are simplified because quantities expressed as per-unit do not change when they are referred from one side of a transformer to t
Most forms of uninterruptible power supply (UPS) can be either powered by battery or flywheel energy. These are ready for immediate use at the instant that the mains electricity fails, but the relatively small and finite amount of stored energy they contain makes them suitable for short periods of use, typically in the order of a few dozen minutes to a couple of hours depending on the actual load.
A large data-center-scale UPS being installed by electricians. An uninterruptible power supply (UPS) or uninterruptible power source is a type of continual power system that provides automated backup electric power to a load when the input power source or mains power fails.
An important property of three-phase power is that the instantaneous power available to a resistive load, = =, is constant at all times.Indeed, let = = To simplify the mathematics, we define a nondimensionalized power for intermediate calculations, =
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
An example of inrush current transients during capacitor bank energization. Inrush current, input surge current, or switch-on surge is the maximal instantaneous input current drawn by an electrical device when first turned on.
A diagram of an electric power system. The transmission system is in blue. Most North American transmission lines are high-voltage three-phase AC, although single phase AC is sometimes used in railway electrification systems.
In the voltage regulation formula, V no load is the voltage measured at the receiving end terminals when the receiving end is an open circuit. The entire short line model is an open circuit in this condition, and no current flows in an open circuit, so I = 0 A and the voltage drop across the line given by Ohm’s law V line drop = IZ line is 0 V.