Search results
Results from the WOW.Com Content Network
The battery management system on the electric vehicle negotiates the maximum current with the electric vehicle supply equipment via dedicated pins in the Type 3C connector. The Type 3 (3A/3C) connectors are generally oval in shape, with circular top and bottom edges and flat right and left edges; the maximum power carried is 24 kW.
CCS1 (Combined Charging System Combo 1) plug as used in North America. It is an extension of the J1772 standard AC charging connector. CCS Combo 1 vehicle inlet showing the J1772 and the two DC fast-charging pins Connectors: Incomplete Combo 2 (left) showing the two large direct current (DC) pins below, while the four alternating current (AC) pins for neutral and three-phase are removed, while ...
Trolley pole wheel on top of the trolley pole of Twin City Rapid Transit Company No. 1300. A current collector (often called a "pickup") is a device used in trolleybuses, trams, electric locomotives and EMUs to carry electric power from overhead lines, electric third rails, or ground-level power supplies to the electrical equipment of the vehicles.
The North American Charging System (NACS), standardized as SAE J3400, is an electric vehicle (EV) charging connector standard maintained by SAE International. [1] Developed by Tesla, Inc., it has been used by all North American market Tesla vehicles since 2021 and was opened for use by other manufacturers in November 2022.
Seville Tram equipped with CAF ACR ground-level power supply, 2019. Ground-level power supply, also known as surface current collection or, in French, alimentation par le sol ("feeding via the ground"), is a concept and group of technologies that enable electric vehicles to collect electric power at ground level instead of the more common overhead lines.
A trolley pole is not attached to the overhead wire. The pole sits atop a sprung base on the roof of the vehicle, with springs providing the pressure to keep the trolley wheel or shoe in contact with the wire. If the pole is made of wood, a cable brings the electric current down to the vehicle. A metal pole may use such a cable, or may itself ...
NREL published following total operating cost per mile: with County Connection, for June 2017 through May 2018, for an 8-vehicle diesel bus fleet, the total operating cost per mile was $0.84; for a 4-vehicle electric bus fleet, $1.11; [167] with Long Beach Transit, for 2018, for a 10-vehicle electric bus fleet, $0.85; [168] and with Foothill ...
The Megawatt Charging System (MCS) is a charging connector under development for large battery electric vehicles.The connector will be rated for charging at a maximum rate of 3.75 megawatts (3,000 amps at 1,250 volts direct current (DC)).