Search results
Results from the WOW.Com Content Network
Double tee structure is an alternative for short to medium spans between 40 and 90 feet (12 and 27 m). There are many standards such as double-tee beam of Texas Department of Transportation and the Northeast Extreme Tee (NEXT) Beam of the Northeast. [8] A benefit of using double tees for bridge replacements is to shorten the construction time.
A double-T beam or double tee beam is a load-bearing structure that resemble two T-beams connected to each other. Double tees are manufactured from prestressed concrete using pretensioning beds of about 200-foot (61 m) to 500-foot (150 m) long. The strong bond of the flange (horizontal section) and the two webs (vertical members) creates a ...
A concrete deck may be an integral part of the bridge structure (T-beam or double tee structure) or it may be supported with I-beams or steel girders. When a bridge deck is installed in a through truss, it is sometimes called a floor system. [1] A suspended bridge deck will be suspended from the main structural elements on a suspension or arch ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents. [1] The shop drawing normally shows more detail than the construction documents.
Drafting templates assist the drafter with creating recurring objects in a drawing without having to reproduce the object from scratch every time. This is especially useful when using common symbols; i.e. in the context of stagecraft , a lighting designer will draw from the USITT standard library of lighting fixture symbols to indicate the ...
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
Idealisation of arching action forces in laterally restrained slab. Arching or compressive membrane action (CMA) in reinforced concrete slabs occurs as a result of the great difference between the tensile and compressive strength of concrete. Cracking of the concrete causes a migration of the neutral axis which is accompanied by in-plane ...